Connect It and transportovereenkomst is provided by Essent Energie on behalf of your regional network provider.
Connecting and transportovereenkomst for electricity and/or gas
the standardised load
and
the regional network operator on whose network the standardised load is connected
Principles for this agreement:
in each region in The Netherlands is a network provider for the grid and a
Network provider for the gastransportnet designated. The network provider that is follows from the
so-called zoning on the basis of the Electricity Act 1998 and the Gaswet. This
zoning is by the Authority Consumer and Market (hereinafter ACM) established
the Minister of Economic Affairs has agreed to the designated network operators;
to electricity and/or gas supplied to get,The standardised load has a connection to the electricity grid and/or the gastransportnet of the network provider;
the standardised load connect a connecting and transportovereenkomst for electricity and/or gas to the network provider;
this agreement regulates the services to maintain the existing
connection(s) and the transport of electricity and/or gas;
The ACM shall draw up an annual maximum rates for the main services of the network operators fixed;
the standardised load to an already existing connection an agreement by itself through its supplier and customer to log in to the network provider.
The content of the agreements between standardised load and network provider:
The system operator shall keep the connection(s) in position,Where the use of standardised load
.
The system operator provides the transport of electricity and/or gas to and from the installation of the standardised load. The standardised load ensures that he still has the right to supply by a supplier.
The system operator provides for the presence of a measurement unit. The standardised load allows the system operator to do that.
For the services provided by the network operator is the standardised load the rates payable as included in the Tarievenblad the system operator (see website of the network provider). The periodic amounts due to the network provider for connection, transport and measurement unit be invoiced by the supplier.
On the connecting and transportovereenkomst apply the current "General
conditions for connection and transport electricity and gas for domestic consumers" (see annex). This can also be downloaded from the website of the network provider. All
network operators in The Netherlands shall apply the same General Conditions.
The obligations of the connecting and transportovereenkomst on the date on which the standardised load as buyer of the system operator in the aansluitingenregister is included.
The standardised load may terminate the agreement at any time and terminate. In the
General Conditions state how can be terminated.
Has the standardised load a complaint about the implementation of this agreement,Then he can appeal to the Disputes Committee Energy (www.degeschillencommissie.nl) or to the competent court in The Netherlands. This complaint must be submitted to the network provider the complaint in an attempt to resolve.
this document as confirmation of a connecting and transportovereenkomst established by means of the notification through a supplier.If the standardised load does not agree with this agreement, it shall within 14 days after he has been able to take note of this, in writing, to the network provider to let them know. In the latter case, the system operator shall immediately suspend the services and/or ceased. That means that there is no electricity and/or gas can be consumed from or inserted on the net.
1 In Case of electricity, a standardised load means "a customer with a connection with a doorlaatwaarde of not more than 3x80 Amp" and in the case of gas, a standardised load means "a customer with a connection with a total maximum capacity of not more than 40 m3 (n) per hour".